2021 PMI-PBA Premium Files Test pdf - Free Dumps Collection [Q108-Q124]

Share

2021 PMI-PBA Premium Files Test pdf - Free Dumps Collection

 Get ready to pass the PMI-PBA Exam right now using our PMI Professional in Business Analysis  Exam Package

NEW QUESTION 108
A business analyst is preparing a requirements management plan and needs to define a method to deal with a complex project with stakeholders who find it difficult to articulate their needs. Which method would best minimize requirements risk?

  • A. Stakeholder analysis
  • B. Questionnaires
  • C. Group decision making
  • D. Prototyping

Answer: B

 

NEW QUESTION 109
A sponsor requests a new requirement The business analyst explains that most of the information needed for this requirement does not exist and that the requirement cannot be implemented. The business analyst recommends deferring the requirement until the needed information is available and then adding it to a subsequent project The sponsor agrees.
What should the business analyst do next?

  • A. Bring the subsequent project to the change control board (CCB).
  • B. Ask the stakeholders to review the requirement before any other action is taken.
  • C. Communicate that the status of this requirement has changed.
  • D. Mark the requirement as complete so that it is not forgotten.

Answer: B

 

NEW QUESTION 110
Which of the following would be the best practice in product validation?

  • A. The evaluation criteria should be the same as what was used to measure the requirement.
  • B. There should be two separate measurements for evaluating each functional requirement.
  • C. The measurement of the requirement should be based on the average of two or more evaluations.
  • D. Two or more testers should test the product using the same test cases so that their evaluations are consistent.

Answer: D

 

NEW QUESTION 111
During user acceptance testing, a defect is logged by a user from a department that did not participate in the requirements analysis. To avoid this situation and minimize impact on the project, the user should have been:

  • A. identified as a stakeholder as part of the stakeholder analysis.
  • B. involved in the development and sign-off of the business requirements.
  • C. interviewed to understand how the user's work would be impacted.
  • D. given the opportunity to review the user acceptance test scripts.

Answer: A

 

NEW QUESTION 112
Which of the following is a method for requirements change control?

  • A. Baselining
  • B. Communication management
  • C. Scope analysis
  • D. Requirements management

Answer: D

 

NEW QUESTION 113
The project sponsor needs lo know which requirements will be implemented. Which of the following would be the most valuable for a business analyst to provide?

  • A. Requirements management plan
  • B. Requirements impact analysis
  • C. Requirements baseline document
  • D. Requirements trace^bility matrix

Answer: D

 

NEW QUESTION 114
Through user acceptance testing, a software flaw was identified. What should the business analyst do next as part of the root cause analysis in order to analyze and resolve the discrepancy?

  • A. Create a Delphi estimation.
  • B. Create a functional decomposition.
  • C. Create a fishbone diagram.
  • D. Create an interface analysis

Answer: C

Explanation:
Explanation/Reference:
Reference: http://www.itqb.org/sites/default/files/glossary/ISTQB_glossary_CTELITP_v3.01%28EN%29.pdf

 

NEW QUESTION 115
Which of the following is an example of a functional requirement?

  • A. The system is able to require passwords.
  • B. The system can handle 3.000 user requests concurrently.
  • C. The system provides an user-friendly interface.
  • D. The system can be accessed from multiple locations.

Answer: D

 

NEW QUESTION 116
What should the business analyst do during the first steps of a project?

  • A. Identify stakeholders and their interests.
  • B. Align the sponsor expectations along the project goals.
  • C. Identify the classes of users and their requirements.
  • D. Evaluate the sources for requirements and prioritize them.

Answer: B

 

NEW QUESTION 117
A business analyst conducts an initial review to define scope. The analysis includes the review of the business case, project goals, and objectives to obtain the necessary and required context. Based on that information, the business analyst determines that this is a large project with multiple interfaces which could cost the company money that was not initially included in the budget.
What characteristics of the project are needed to determine the approach so that the business analyst can validate whether they will need to have a discussion about the budget?

  • A. Selected project life cycle
  • B. Decision on the type of models to be used
  • C. Business analysis deliverables to be produced
  • D. Type of elicitation activities to be conducted

Answer: C

 

NEW QUESTION 118
After a project was delivered, the business analyst learns of a project objective with no associated requirement.
What would have helped determine this issue before delivery?

  • A. Use cases
  • B. Context diagram
  • C. Tracing requirements
  • D. Process flow

Answer: C

 

NEW QUESTION 119
The best way to ensure the integrity of requirements is to:

  • A. establish a requirements baseline, establish a change control board, and label each requirement uniquely
  • B. implement version control, maintain a history of requirements changes, and track the status of each requirement
  • C. use a requirements management tool, measure requirements volatility, and maintain a history of requirements changes
  • D. establish a change control board, track the status of each requirement, and use a requirements management tool.

Answer: A

Explanation:
Explanation/Reference: https://www.scribd.com/document/404076259/PMI-PBA-Course-Manual-Printing

 

NEW QUESTION 120
A business analyst is assigned to a business process re-engineering project. In addition to planning a workshop to elicit requirements, the business analyst wants to send out a survey to gather data to use in a statistical analysis on user satisfaction with the current business process.
Which of the following types of surveys would be most appropriate to create and why?

  • A. An open-ended survey to allow users the opportunity to explain their opinions on the current business process
  • B. A closed-ended survey to pose several multiple choice questions and ask the users if the current business process is correct
  • C. A closed-ended survey using the Likert scale to rank specific areas of the current business process
  • D. An open-ended survey to collect different opinions on the current business process

Answer: B

 

NEW QUESTION 121
Which technique allows the collection of the maximum number of ideas on a subject from a group without considering the validity or practicality of the ideas?

  • A. Interviewing
  • B. Brainstorming
  • C. Surveying
  • D. Prototyping

Answer: C

 

NEW QUESTION 122
Which document best provides the boundaries for product development?

  • A. Requirements baseline
  • B. Project plan
  • C. Scope definition
  • D. Scope document

Answer: A

 

NEW QUESTION 123
The business managers had clearly slated that the delivered website must simultaneously accommodate millions of users around the globe. However, within the first week of the production launch, the website crashes frequently.
This situation could have been averted if:

  • A. nonfunctional requirements were identified and tested
  • B. essential product requirements were captured and tested.
  • C. quality attributes were captured and tested.
  • D. critical business requirements were accommodated and tested.

Answer: A

 

NEW QUESTION 124
......

Master 2021 Latest The Questions PMI Professional in Business Analysis and Pass PMI-PBA  Real Exam!: https://www.actual4exams.com/PMI-PBA-valid-dump.html

A fully updated 2021 PMI-PBA Exam Dumps exam guide from training expert Actual4Exams: https://drive.google.com/open?id=1qXxJ7_-gp7mZmYYhCxFPoPf7rEyK98YE