NEW QUESTION # 40
How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.
- A. GMP-compliant flag
- B. Digital signature
- C. Batch record
- D. Approved resources
- E. Recipe approval
Answer: B,C,E
NEW QUESTION # 41
What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.
- A. Option to use make-to-order production
- B. Reduced delivery times
- C. Reduced production times
- D. Option to forecast planning for production resources
Answer: A,D
NEW QUESTION # 42
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Installation point
- B. Quantity
- C. Item type
- D. Scrap percentage
Answer: A,B
NEW QUESTION # 43
Which materials have a negative quantity in a bill of material or in a recipe?
Note: There are 3 correct answers to this question
- A. Continuous flow materials
- B. Co-products
- C. Waste products
- D. Bulk materials
- E. By-products
Answer: B,C,E
NEW QUESTION # 44
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Note: There are 2 correct answers to this question
- A. Repetitive manufacturing profile
- B. Production cost collector
- C. Routing
- D. Production version
Answer: C,D
NEW QUESTION # 45
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing must NOT have alternative sequences
- B. The lot size range must be within the lot size range of the assigned routing.
- C. The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.
- D. The assigned routing must be a rate routing.
- E. The deletion flag must NOT be set for the bill of material (BOM) or the routing
Answer: B,C,E
NEW QUESTION # 46
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use batch determination
- B. Use the Batch Information Cockpit.
- C. Use batch derivation.
- D. Use the batch where-used list.
Answer: B,D
Explanation:
To identify all affected finished goods stocks that contain a deviated raw material batch, you can use the following tools:
The Batch Information Cockpit (BIC) is a central tool that provides an overview of all relevant information and documents related to a batch. You can use the BIC to display the batch genealogy, which shows the hierarchical relationships between batches along the production and distribution process. You can also use the BIC to display the batch traceability, which shows the chronological sequence of events and transactions that affect a batch. The BIC allows you to analyze the batch history and the batch usage across different plants and systems.
The batch where-used list is a tool that determines how a batch is created and used in Production Planning (PP) through various stages of production and displays the result in a list. You can use the batch where-used list to find out in which other batches a batch was used and from which other batches a batch was created. This is important in the case of complaints and questions about product safety if the composition of semi-finished and finished products has to be documented across all production levels.
Batch derivation and batch determination are not tools to identify affected finished goods stocks, but rather tools to assign batches to production orders or sales orders based on certain criteria. Batch derivation is a process of transferring characteristics or values from one batch to another, while batch determination is a process of finding suitable batches for a requirement based on predefined conditions. References: Batch Information Cockpit | SAP Help Portal, Batch Where-Used List | SAP Help Portal.
NEW QUESTION # 47
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.
- A. In pro duct-related COC, all costs are debited and credited to a product cost collector.
- B. Product-related COC is used in manufacturing for co-products
- C. Order-related COC is beneficial in a flexible production environment
- D. In order-related COC, individual production orders do NOT have cost segments.
Answer: A,C
NEW QUESTION # 48
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.
- A. Use a specific material group
- B. Use a specific MRP type
- C. Use a specific material status
- D. Use a specific MRP list
Answer: B,D
NEW QUESTION # 49
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question
- A. Define the special procurement type inside the material master.
- B. Define the special procurement type inside the BOM
- C. Change the item category of the phantom assembly in the bill of material *-' (BOM)
- D. Change the phantom item indicator for the phantom assembly in the bill of material (BOM)
Answer: A,D
NEW QUESTION # 50
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Material
- B. Work Center
- C. Production Version
- D. plant
Answer: A,B
NEW QUESTION # 51
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Setup time
- B. Float before production
- C. Move Time
- D. Pick/pack time
- E. Queue time
Answer: A,D,E
NEW QUESTION # 52
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA.
When can you use mode selection?
- A. When multiple operations are maintained for one product
- B. When alternative resources are used within one operation
- C. When multiple planned orders exist on one resource
- D. When multiple production versions are maintained for one product
Answer: B
NEW QUESTION # 53
For a production version to be valid and consistent, what requirements must be fulfilled? Note:There are 3 correct answers to this question.
- A. The assigned routing must NOT have alternative sequences
- B. The lot size range must be within the lot size range of the assigned routing.
- C. The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.
- D. The assigned routing must be a rate routing.
- E. The deletion flag must NOT be set for the bill of material (BOM) or the routing
Answer: B,C,E
Explanation:
A production version is a combination of a BOM and a routing that defines how a material is produced. For a production version to be valid and consistent, the following requirements must be fulfilled:
The deletion flag must NOT be set for the BOM or the routing. The deletion flag indicates that the BOM or the routing is no longer used and should be archived. If the deletion flag is set, the production version cannot be used for production planning or execution.
The lot size range must be within the lot size range of the assigned routing. The lot size range specifies the minimum and maximum order quantity for which the production version is valid. The lot size range of the production version must match or be smaller than the lot size range of the routing, otherwise the system will not find a suitable routing for the production order.
The assigned routing and BOM must be valid in the entire validity period. The validity period defines the time frame for which the production version is valid. The validity period of the production version must be within or equal to the validity periods of the routing and the BOM, otherwise the system will not find a consistent BOM and routing combination for the production order. References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 113; [SAP Help Portal:
Production Version].
NEW QUESTION # 54
Which of the following elements does MRP take into account during net requirement calculation? Note:
There are 2 correct answers to this question.
- A. Forecast key figures
- B. Safety Stock
- C. Maximum stock level
- D. Purchase orders
Answer: A,B
NEW QUESTION # 55
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Quantity
- B. Installation point
- C. Item type
- D. Scrap percentage
Answer: A,D
Explanation:
The subitems of a bill of material (BOM) are the components that make up the product or assembly. You can maintain the following data for each subitem:
Quantity: This is the number of units of the component that are required for one unit of the product or assembly. You can specify the quantity in different units of measure, such as base unit, order unit, or alternative unit. You can also use variable quantities, such as percentages or formulas, to calculate the quantity dynamically based on the product or assembly characteristics.
Scrap percentage: This is the percentage of the component that is expected to be wasted or lost during the production or assembly process. You can specify the scrap percentage for each component to adjust the quantity accordingly. For example, if the quantity of a component is 10 and the scrap percentage is
5%, the system will increase the quantity by 0.5 to account for the scrap.
The installation point (A) and the item type (B) are not data that you can maintain in the subitems of a BOM.
The installation point is a field in the equipment master record that indicates where the equipment is installed.
The item type is a field in the sales document item that determines the processing and pricing of the item.
These fields are not relevant for the BOM subitems. References:
https://sapstack.com/pp/bom-in-sap-bill-of-material/
https://skillstek.com/bill-of-material-in-sap/
NEW QUESTION # 56
......
C-TS422-2022 Exam Practice Materials Collection: https://www.actual4exams.com/C-TS422-2022-valid-dump.html
Get Latest and 100% Accurate C-TS422-2022 Exam Questions: https://drive.google.com/open?id=1rijCONtT6W7AI6aI8_QmBoHEOjvGMizw