NEW QUESTION # 16
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
- A. Dual Stack split
- B. Database migration
- C. Release upgrade
- D. Homogenous system copy
- E. Support Package Stack update
Answer: B,C,E
NEW QUESTION # 17
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Delete client 066 (Early Watch Client)
- B. Uninstall industry extensions not supported by SAP S/4HANA
- C. Uninstall Fiori apps not released for SAP_UI 7.50
- D. Install add-on SAP Gateway 7.50
Answer: A,C
NEW QUESTION # 18
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. An SAP S4HANA 1709 sandbox system
- B. AA
- C. A Standalone SAP system with ABAP 7.51 or above
Answer: A,C
NEW QUESTION # 19
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Single System" when installing an Add-On
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the main configuration option "Single System" in case of an upgrade.
- D. Using the database migration option (DMO) for SUM
Answer: A
NEW QUESTION # 20
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Perform the migration of data into the new data structure
- B. Apply the recommendations of the simplification list
- C. Run the database migration to the SAP HANA database
- D. Check the compatibility of custom code with SAP S/4HANA
Answer: B,D
NEW QUESTION # 21
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_IMPORT_ALL
- B. EU_CLONE_MIG_SOT_RUN
- C. EU_CLONE_MIG_DT_CREATE
- D. EU_CLONE_MIG_DT_RUN
Answer: D
NEW QUESTION # 22
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:
- A. Check the log files written under "SUM\abap\log"
- B. Check logs for jobs starting with "RSUPG_SGEN" in the system
- C. Check the dump size of the database export on disk
- D. Check the "Charts Control Center" in the SUM UI
Answer: A,D
NEW QUESTION # 23
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
- A. Apply SAP support packages
- B. Upgrade the SAP system
- C. Perform an SAP S/4 HANA conversion including DMO
- D. Use DMO for SUM
- E. Perform an SAP S/4 HANA conversion without DMO
Answer: A,B,D
NEW QUESTION # 24
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Silent data migration (SDM)
- B. Downtime migration
- C. Shadow on target creation
- D. Downtime conversion
Answer: B
NEW QUESTION # 25
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
- A. Table count verification
- B. DMO with system move
- C. Table contents compare
- D. Migration repetition option
Answer: B
NEW QUESTION # 26
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the database migration
- B. The start of the business downtime
- C. The start of the Execution roadmap step
- D. The end of the business downtime
Answer: D
NEW QUESTION # 27
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Database migration
- B. Software update
- C. Unicode conversion
- D. Custom code analysis
Answer: A,B
NEW QUESTION # 28
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.
- B. These are 40 pairs of Reload processes, so there are 80 R3load processes running.
- C. Without table contents comparison, only 40 R3load processes are being started.
- D. SUM is still running in uptime; the 40 defined Reload processes are considered.
Answer: C
NEW QUESTION # 29
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. At the end of the downtime
- B. Early in the downtime
- C. As part of the cleanup process
- D. Before the downtime starts
Answer: D
NEW QUESTION # 30
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. SE80 (Object Navigator)
- B. SYCM (Simplification Database Content)
- C. SAT (Runtime Analysis)
- D. ATC (ABAP Test Cockpit)
Answer: A,D
NEW QUESTION # 31
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
- C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
&UC) procedure. - D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
Answer: A
NEW QUESTION # 32
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the most recent entries in SAPup.log
- B. Check the messages shown by the SUM UI
- C. Check the most recent entries shown in file sapevt.trc
- D. Check the system log (transaction SM21) of the SAP system
Answer: A,B
NEW QUESTION # 33
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Extract the SAP HANA database installation archive
- B. Move the SAPM update archive into the download folder
- C. Move the stack.xml update file into the download folder
- D. Extract the SAP HANA client installation archive
- E. Move the R3trans update archive into the download folder
Answer: B,C,D
NEW QUESTION # 34
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. Dedicated application tables are migrated in uptime
- B. TABIMJJPG is executed in uptime
- C. An additional temporary database is used during uptime
- D. The repository is migrated in uptime
Answer: A
NEW QUESTION # 35
......
E-S4HCON2023 Exam Crack Test Engine Dumps Training With 81 Questions: https://www.actual4exams.com/E-S4HCON2023-valid-dump.html
Getting E-S4HCON2023 Certification Made Easy: https://drive.google.com/open?id=1AIXP3jVueLpA_Zmwmel0zIpGUSJD5-cs