Latest SAP C-IBP-2302 Free Certification Exam Material with 82 Q&As
UPDATED C-IBP-2302 Exam Questions Certification Test Engine to PDF
To take the SAP C_IBP_2302 certification exam, candidates must have a minimum of one year of experience in SAP IBP for Supply Chain. Candidates should also have a good understanding of the SAP IBP for Supply Chain solution and its functionalities.
NEW QUESTION # 22
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.
- A. Change the description of the attributes in the time profile.
- B. Add a new time profile level to the time profile.
- C. Change the past and future horizon of the levels in the time profile.
- D. Change the numbering hierarchy of the period IDs in the time profile.
Answer: A,C
NEW QUESTION # 23
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Minimum lot size
- B. Maximum lot size
- C. Transportation lead times
- D. Aggregated constraints
- E. Adjusted transport receipts
Answer: B,C,E
NEW QUESTION # 24
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Violation of minimum aggregated inventory values
- B. Violation of minimum resource utilization
- C. Not respecting production capacity
- D. Not-fully satisfied demands
- E. Not adhering to maximum transport values
Answer: A,B,D
NEW QUESTION # 25
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the sourcing in the Production Source Item Master Data type exists.
- B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the required planning level master data exists for a subset of input key figures.
Answer: C,D,E
NEW QUESTION # 26
What function would you use to configure a year-to-date calculation?
- A. Rolling Aggregation
- B. Dynamic Rolling Aggregation
- C. Cumulative Aggregation
- D. Last Period Aggregation
Answer: C
NEW QUESTION # 27
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.
- A. Management business Review, by providing the inventory targets for endorsement
- B. Supply Review, by providing an input to supply network planning
- C. Demand Review, by using the output of demand planning as input into calculations
- D. Reconciliation Review, by providing inventory parameters for one consolidated plan
Answer: A,D
NEW QUESTION # 28
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.
- A. Planning view templates in the SAP IBP add-in for Microsoft Excel
- B. Snapshot operator in the SAP IBP add-in for Microsoft Excel
- C. Jobs in the Applications Jobs app
- D. Supply chain graph in Supply Chain Network app
Answer: A,C
NEW QUESTION # 29
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.
- A. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
- B. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
- C. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
- D. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
Answer: A,B
NEW QUESTION # 30
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?
- A. Download the Initial Problem Report in the Data Integration app.
- B. Navigate to the Master Data Workbook in Excel and open the Log.
- C. Download the Rejection Report in the Data Integration app.
- D. Navigate to the Manage Master Data app and open the Log.
Answer: D
NEW QUESTION # 31
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.
- A. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
- B. Filter blocks are imposed when modeling cross-period calculations.
- C. Filter blocks are imposed when modeling an attribute as a key figure.
- D. Filter blocks are imposed when modeling attribute transformations.
- E. Filter blocks can be visualized in the Key Figure Calculations app.
Answer: A,C,D
NEW QUESTION # 32
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.
- A. Used by end-users in planning views to help visualize cross-period calculations
- B. Used when you have more than three inputs at different planning levels in one calculation
- C. Used at any level of calculation level except the Request Level
- D. Used to break down a large calculation into manageable subcalculations
Answer: B,D
NEW QUESTION # 33
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.
- A. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
- B. Choose time-independent key figures as segmentation measures.
- C. Identify inventory items that require closer attention.
- D. Substitute missing values in case of sporadic demands.
Answer: B,C
NEW QUESTION # 34
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Lot sizes are applicable for production and handling quantities.
- B. Periodic lot size setting overrides the minimum lot size.
- C. Lot sizes are applicable for production and transportation quantities.
- D. Lot sizes are time-independent master data settings.
Answer: A,D
NEW QUESTION # 35
Which features apply to quota violations modeled with the optimizer?
- A. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.
- B. Min and Max Quotas have to be the same as sourcing ratios.
- C. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
- D. Quotas can be modeled for sourcing location, production, and consensus demand.
Answer: C
NEW QUESTION # 36
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. Lag-based snapshots are created in the Configuration app for a fixed time range.
- B. The number of lag-based snapshots are limited to nine levels.
- C. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
- D. Target key figures for these snapshots are exposed to the user in planning views.
Answer: A,C
NEW QUESTION # 37
......
SAP C-IBP-2302 (Certified Application Associate - SAP IBP for Supply Chain Planning (2302)) certification exam is designed to test the skills required for fundamental understanding and application of SAP Integrated Business Planning (IBP) for Supply Chain Planning processes. C-IBP-2302 exam validates the knowledge of candidates on the essential concepts of SAP IBP for Supply Chain Planning, including demand management, inventory optimization, response and supply planning, and sales and operations planning.
Get The Important Preparation Guide With C-IBP-2302 Dumps: https://www.actual4exams.com/C-IBP-2302-valid-dump.html