NEW QUESTION 49
Which of the following techniques is best for monitoring loads and capacities?
- A. Exponential smoothing
- B. Discrete lot sizing
- C. Rough-cut capacity planning
- D. Input/output control
Answer: D
NEW QUESTION 50
Which plant type describes a product at one stage that can be transformed into several distinct products
at the next stage (divergent points)?
- A. T-Plant
- B. A-Plant
- C. I-Plant
- D. V-Plant
Answer: D
NEW QUESTION 51
Which of the following processes commits orders against available capacity as well as inventory?
- A. Capable-to-promise
- B. Make-to-order
- C. Engineered-to-order
- D. Available-to-promise
Answer: A
NEW QUESTION 52
Which of the following types of layouts is most efficient in a lean production environment?
- A. Islands
- B. Functional layout
- C. Cells
- D. Connected islands
Answer: C
NEW QUESTION 53
Which of the following plans generally includes an organization's explicit mission, goals, and objectives,
along with the specific actions needed to achieve those goals and objectives?
- A. Financial
- B. Marketing
- C. Strategic
- D. Business
Answer: C
NEW QUESTION 54
Which of the following terms represents a complete supply chain dedicated to the flow of products and
materials for the purpose of returns, repair, remanufacture, or recycling?
- A. Responsible landfill
- B. Global distribution
- C. Reverse logistics
- D. Remanufacturing resource planning
Answer: C
NEW QUESTION 55
The primary purpose of enterprise resources planning is to:
- A. use external knowledge to seek an internal advantage.
- B. focus on the manufacturing function within an organization.
- C. integrate an approach to business management.
- D. provide data protection along the supply chain.
Answer: C
NEW QUESTION 56
The lean production concept works best in which of the following manufacturing environments?
- A. Make-to-order
- B. Intermittent
- C. Flow
- D. Project
Answer: C
NEW QUESTION 57
A 5-year decline in demand for diapers most closely represents which of the following types of forecast
patterns?
- A. Cyclic
- B. Trend
- C. Irregular
- D. Seasonal
Answer: B
NEW QUESTION 58
Which of the following differences must be taken into consideration when dealing with a global distribution
system?
- A. Cost
- B. Carriers
- C. Computer systems
- D. Culture
Answer: D
NEW QUESTION 59
If the quantity ordered equals the quantity required in a time bucket, which of the following lot-sizing rules
has been used?
- A. Fixed order quantity
- B. Order "N" periods supply
- C. Economic order quantity (EOQ)
- D. Lot-for-lot
Answer: D
NEW QUESTION 60
In the total cost concept, which of the following logistics costs should be considered when selecting a
transportation mode?
- A. Receiving inspection costs
- B. Inventory carrying costs
- C. Import duty costs
- D. Inventory purchasing costs
Answer: B
NEW QUESTION 61
Which of the following types of manufacturing processes would tend to have the lowest work in process
(WIP) inventory?
- A. Intermittent
- B. Flow
- C. Batch
- D. Project
Answer: B
NEW QUESTION 62
To provide the required level of customer service, to minimize the costs of transportation and handling,
and to interact with a factory to minimize scheduling problems are all objectives of:
- A. distribution inventory management.
- B. enterprise resources planning.
- C. customer relations management.
- D. sales and operations planning.
Answer: A
NEW QUESTION 63
Which of the following systems typically involves design while manufacturing is occurring?
- A. Intermittent
- B. Flow
- C. Engineer
- D. Project
Answer: D
NEW QUESTION 64
In an assemble-to-order production environment, the master production schedule contains:
- A. subassemblies.
- B. finished items.
- C. standard items.
- D. raw materials.
Answer: A
NEW QUESTION 65
When demand is uncertain, what is the most appropriate action to take?
- A. Recalculate safety stock
- B. Increase order quantity
- C. Increase number of warehouses for distribution
- D. Change method of transportation
Answer: A
NEW QUESTION 66
Which of the following processes is concerned with the change of ownership of goods and services?
- A. Value chain
- B. Distribution channel
- C. Transaction channel
- D. Supply chain
Answer: C
NEW QUESTION 67
Which of the following plans is translated into synchronized functional plans through the sales and
operations planning process?
- A. Financial
- B. Strategic
- C. Business
- D. Marketing
Answer: C
NEW QUESTION 68
......
Salary of APICS CPIM - BSCM certified professionals
The salary of APICS CPIM - BSCM certified professionals varies from $110K to $144K depending on the years of experience.
A fully updated 2021 CPIM-BSCM Exam Dumps exam guide from training expert Actual4Exams: https://www.actual4exams.com/CPIM-BSCM-valid-dump.html