SAP C-TS422-1909 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.


SAP C-TS422-1909 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.


 

NEW QUESTION 42
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The work center has several individual capacities.
  • B. The Change Planning Direct on indicator is set.
  • C. Alternative resources are fully occupied.
  • D. The planning strategy is infinite.

Answer: A,D

 

NEW QUESTION 43
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:

  • A. They can be applied to make-to-stock production order.
  • B. They can be used for manufacturing with collective orders.
  • C. They can be used for repetitive manufacturing.
  • D. They can be created automatically during month end process.

Answer: A,C

 

NEW QUESTION 44
Which capabilities does the Alert monitor have?
There are 3 correct answers to this question.
Response:

  • A. Nominate time-dependent substitutes for a planner
  • B. Automatically predict alerts in future planning cycles
  • C. Automatically reschedule in case of overload alerts
  • D. Generate alerts based on defined threshold values
  • E. Automatically send alerts with Alert Notification Engine

Answer: A,D,E

 

NEW QUESTION 45
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Planning mode (bucket/sequence)
  • B. Direction (forward/backward)
  • C. Fixed pegging (on/off)
  • D. Finiteness level (0...1)
  • E. Scheduling control (finite/infinite)

Answer: A,B,E

 

NEW QUESTION 46
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Move time
  • B. Wait time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: B,D,E

 

NEW QUESTION 47
How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.

  • A. Using run schedule quantities for in-house production
  • B. Using stock transfer reservations for stock transfer
  • C. Using purchasing costs for automated source prioritization
  • D. Using quotations for internal and external procurement
  • E. Using purchase orders for external procurement

Answer: A,B,E

 

NEW QUESTION 48
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.

  • A. It is used by product costing to determine how costs are rolled up.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by ATP to determine the priority of alternative components.

Answer: A,B

 

NEW QUESTION 49
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:

  • A. By activating the user statuses in status and action management
  • B. By enhancing the system status customizing table with user statuses
  • C. By creating a user profile and assigning it to the production scheduling profile
  • D. By defining a status profile and assigning it to the order type

Answer: B

 

NEW QUESTION 50
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Execute a new production planning run.
  • C. Select an alternative mode on a resource.
  • D. Reduce the planning window.
  • E. Form optimum sequences to reduce setup times.

Answer: A,C,E

 

NEW QUESTION 51
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Enhanced characteristics based processes
  • B. Enhanced Kanban Processing
  • C. Parts interchangeability
  • D. Packaging Logistics
  • E. Equipment and Tools Management

Answer: B,C,D

 

NEW QUESTION 52
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Product-related
  • B. Milestone-related
  • C. Order-related
  • D. Cost-related

Answer: A,C

 

NEW QUESTION 53
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the minimum order quantity.
  • B. Use the MRP type for vendor managed inventory.
  • C. Use the reorder point.
  • D. Use the fixed lot size procedure.

Answer: D

 

NEW QUESTION 54
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:

  • A. Multidimensional Reporting client (MDRC)
  • B. ABAP Managed Core Data Services (CDS)
  • C. Smart Business Cockpit
  • D. HANA Live

Answer: B

 

NEW QUESTION 55
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
"W1904_1000_001". What does the suffix 001 in the resource name represent?
Please choose the correct answer.
Response:

  • A. Capacity category
  • B. Available capacity version
  • C. Work center category
  • D. Number of individual capacities

Answer: A

 

NEW QUESTION 56
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Kanban
  • B. Picking list
  • C. Transfer Order
  • D. Backflushing

Answer: B

 

NEW QUESTION 57
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:

  • A. Default unit of measure
  • B. Default values for the item status
  • C. Allowed material type
  • D. Maximum allowed low-level code

Answer: C

 

NEW QUESTION 58
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:

  • A. MRP Live can propose alternative solutions
  • B. MRP Live can create production orders automatically
  • C. MRP Live can priorities demand from sales orders
  • D. MRP Live can plan materials with recursive BOMs

Answer: A

 

NEW QUESTION 59
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:

  • A. Confirmation profile
  • B. Production scheduling profile
  • C. Scheduling margin key
  • D. Operation control key

Answer: B,D

 

NEW QUESTION 60
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Dependent Requirements indicator
  • B. Mixed MRP indicator
  • C. Storage Location MRP Indicator
  • D. Individual/Collective Indicator

Answer: B

 

NEW QUESTION 61
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note:
There are 2 correct answers to this question.

  • A. Use a specific material group
  • B. Use a specific MRP type.
  • C. Use a specific material status.
  • D. Use a specific MRP controller.

Answer: B,D

 

NEW QUESTION 62
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the item category of the phantom assembly in the BOM.
  • B. Change the phantom item indicator for the phantom assembly in the BOM.
  • C. Change the special procurement key of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D

 

NEW QUESTION 63
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive offset time in the strategy profile.
  • B. Specify a negative offset time in the strategy profile.
  • C. Specify a positive planning horizon in the strategy profile.
  • D. Specify a negative planning horizon in the strategy profile.

Answer: B

 

NEW QUESTION 64
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a separate resource in the production data structure.
  • B. Model a transportation resource in the location master.
  • C. Model a handling resource in the location master and goods receipt time in the mater all master.
  • D. Model a resource inbound in the location master.

Answer: B,C

 

NEW QUESTION 65
For what production type are production orders used?

  • A. Process manufacturing processes
  • B. Period and quantity-oriented production
  • C. Replenishment controlled by control cycles
  • D. Discrete manufacturing processes

Answer: D

 

NEW QUESTION 66
......


C-TS422-1909 Exam Certification Details:

Exam:80 questions
Languages:German, English, French, Chinese
Sample Questions: SAP C-TS422-1909 Exam Sample Question
Cut Score:55%
Duration:180 mins
Level:Associate

 

Grab latest Amazon C-TS422-1909 Dumps as PDF Updated: https://www.actual4exams.com/C-TS422-1909-valid-dump.html