[Jan 25, 2022] Genuine C-TS422-1909 Exam Dumps New 2022 SAP Pratice Exam
New 2022 Realistic C-TS422-1909 Dumps Test Engine Exam Questions in here
SAP C-TS422-1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
SAP C-TS422-1909 Certification Exam Topics:
Topic Areas | Topic Details, Courses, Books |
---|---|
Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
NEW QUESTION 42
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The work center has several individual capacities.
- B. The Change Planning Direct on indicator is set.
- C. Alternative resources are fully occupied.
- D. The planning strategy is infinite.
Answer: A,D
NEW QUESTION 43
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
- A. They can be applied to make-to-stock production order.
- B. They can be used for manufacturing with collective orders.
- C. They can be used for repetitive manufacturing.
- D. They can be created automatically during month end process.
Answer: A,C
NEW QUESTION 44
Which capabilities does the Alert monitor have?
There are 3 correct answers to this question.
Response:
- A. Nominate time-dependent substitutes for a planner
- B. Automatically predict alerts in future planning cycles
- C. Automatically reschedule in case of overload alerts
- D. Generate alerts based on defined threshold values
- E. Automatically send alerts with Alert Notification Engine
Answer: A,D,E
NEW QUESTION 45
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Planning mode (bucket/sequence)
- B. Direction (forward/backward)
- C. Fixed pegging (on/off)
- D. Finiteness level (0...1)
- E. Scheduling control (finite/infinite)
Answer: A,B,E
NEW QUESTION 46
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Move time
- B. Wait time
- C. Float before production
- D. Pick/pack time
- E. Queue time
Answer: B,D,E
NEW QUESTION 47
How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.
- A. Using run schedule quantities for in-house production
- B. Using stock transfer reservations for stock transfer
- C. Using purchasing costs for automated source prioritization
- D. Using quotations for internal and external procurement
- E. Using purchase orders for external procurement
Answer: A,B,E
NEW QUESTION 48
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used by product costing to determine how costs are rolled up.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by ATP to determine the priority of alternative components.
Answer: A,B
NEW QUESTION 49
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:
- A. By activating the user statuses in status and action management
- B. By enhancing the system status customizing table with user statuses
- C. By creating a user profile and assigning it to the production scheduling profile
- D. By defining a status profile and assigning it to the order type
Answer: B
NEW QUESTION 50
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Execute a new production planning run.
- C. Select an alternative mode on a resource.
- D. Reduce the planning window.
- E. Form optimum sequences to reduce setup times.
Answer: A,C,E
NEW QUESTION 51
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Enhanced characteristics based processes
- B. Enhanced Kanban Processing
- C. Parts interchangeability
- D. Packaging Logistics
- E. Equipment and Tools Management
Answer: B,C,D
NEW QUESTION 52
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Product-related
- B. Milestone-related
- C. Order-related
- D. Cost-related
Answer: A,C
NEW QUESTION 53
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the minimum order quantity.
- B. Use the MRP type for vendor managed inventory.
- C. Use the reorder point.
- D. Use the fixed lot size procedure.
Answer: D
NEW QUESTION 54
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
- A. Multidimensional Reporting client (MDRC)
- B. ABAP Managed Core Data Services (CDS)
- C. Smart Business Cockpit
- D. HANA Live
Answer: B
NEW QUESTION 55
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
"W1904_1000_001". What does the suffix 001 in the resource name represent?
Please choose the correct answer.
Response:
- A. Capacity category
- B. Available capacity version
- C. Work center category
- D. Number of individual capacities
Answer: A
NEW QUESTION 56
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Kanban
- B. Picking list
- C. Transfer Order
- D. Backflushing
Answer: B
NEW QUESTION 57
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:
- A. Default unit of measure
- B. Default values for the item status
- C. Allowed material type
- D. Maximum allowed low-level code
Answer: C
NEW QUESTION 58
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:
- A. MRP Live can propose alternative solutions
- B. MRP Live can create production orders automatically
- C. MRP Live can priorities demand from sales orders
- D. MRP Live can plan materials with recursive BOMs
Answer: A
NEW QUESTION 59
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
- A. Confirmation profile
- B. Production scheduling profile
- C. Scheduling margin key
- D. Operation control key
Answer: B,D
NEW QUESTION 60
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Dependent Requirements indicator
- B. Mixed MRP indicator
- C. Storage Location MRP Indicator
- D. Individual/Collective Indicator
Answer: B
NEW QUESTION 61
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note:
There are 2 correct answers to this question.
- A. Use a specific material group
- B. Use a specific MRP type.
- C. Use a specific material status.
- D. Use a specific MRP controller.
Answer: B,D
NEW QUESTION 62
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the item category of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the special procurement key of the phantom assembly in the BOM.
- D. Change the explosion type of the phantom assembly in the BOM.
Answer: D
NEW QUESTION 63
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
- A. Specify a positive offset time in the strategy profile.
- B. Specify a negative offset time in the strategy profile.
- C. Specify a positive planning horizon in the strategy profile.
- D. Specify a negative planning horizon in the strategy profile.
Answer: B
NEW QUESTION 64
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.
- A. Model a separate resource in the production data structure.
- B. Model a transportation resource in the location master.
- C. Model a handling resource in the location master and goods receipt time in the mater all master.
- D. Model a resource inbound in the location master.
Answer: B,C
NEW QUESTION 65
For what production type are production orders used?
- A. Process manufacturing processes
- B. Period and quantity-oriented production
- C. Replenishment controlled by control cycles
- D. Discrete manufacturing processes
Answer: D
NEW QUESTION 66
......
C-TS422-1909 Exam Certification Details:
Exam: | 80 questions |
Languages: | German, English, French, Chinese |
Sample Questions: | SAP C-TS422-1909 Exam Sample Question |
Cut Score: | 55% |
Duration: | 180 mins |
Level: | Associate |
Grab latest Amazon C-TS422-1909 Dumps as PDF Updated: https://www.actual4exams.com/C-TS422-1909-valid-dump.html