Online Questions - Valid Practice To your C-TS422-1909 Exam (Updated 91 Questions) [Q40-Q57]

Share

Online Questions - Valid Practice To your C-TS422-1909 Exam (Updated 91 Questions)

Practice To C-TS422-1909 - Remarkable Practice On your SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Exam

NEW QUESTION 40
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:

  • A. Minimum lot sizing
  • B. Fixed lot sizing
  • C. Exact lot sizing
  • D. Periodic lot sizing

Answer: D

 

NEW QUESTION 41
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Indicator Relevant for finite scheduling must be set.
  • C. PRT Availability check must be set.
  • D. Checking rule and group must be assigned.

Answer: A,B

 

NEW QUESTION 42
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:

  • A. Floating time
  • B. Processing time
  • C. Queue time
  • D. Move time
  • E. Tear down time

Answer: A,C,D

 

NEW QUESTION 43
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:

  • A. Individual control recipes
  • B. Individual phases
  • C. Individual operations
  • D. Individual process instructions

Answer: B,C

 

NEW QUESTION 44
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Operation network
  • C. Resource network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 45
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Sales Order BOM
  • C. Functional Location BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 46
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Creation of a purchasing contract
  • B. Change of the storage bin
  • C. Creation of dependent requirements
  • D. Creation of a sales order
  • E. Change of the material's procurement type

Answer: C,D,E

 

NEW QUESTION 47
When do you use variant bills of materials (BOMB)?

  • A. When multiple material also have the same BOM
  • B. When a material has a configurable BOM
  • C. When multiple material is have similar BOMB
  • D. When a material has multiple BOMB

Answer: A

 

NEW QUESTION 48
What is the purpose of collective orders?

  • A. To post production costs on a cost collector instead of the production order
  • B. To post any component withdrawals single back flush with order confirmation
  • C. To combine order management of co-products and by-products with the main product
  • D. To manage production orders for an entire finished product on multiple levels

Answer: D

 

NEW QUESTION 49
Where do you maintain the duration of a product on operation?

  • A. Material master
  • B. Routing
  • C. Bill of material (BOM)
  • D. Work instructions

Answer: B

 

NEW QUESTION 50
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To reduce the total production lead time for along production line
  • C. To provide timely updates of inventory management for the staged components
  • D. To stage different components for a production line simultaneously

Answer: A,C

 

NEW QUESTION 51
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:

  • A. MRP Live can priorities demand from sales orders
  • B. MRP Live can create production orders automatically
  • C. MRP Live can plan materials with recursive BOMs
  • D. MRP Live can propose alternative solutions

Answer: D

 

NEW QUESTION 52
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:

  • A. Engineering Change Record
  • B. Bill of Material
  • C. Routing
  • D. Production Version

Answer: B,C,D

 

NEW QUESTION 53
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:

  • A. Infinite resource and infinite strategy
  • B. Infinite resource and finite strategy
  • C. Finite resource and infinite strategy
  • D. Finite resource and finite strategy

Answer: D

 

NEW QUESTION 54
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements without checking the capacity of a work center.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: C

 

NEW QUESTION 55
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The least restrictive status
  • C. The cross-plant status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 56
What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question.
Response:

  • A. Only the OLAP system has the latest data
  • B. The OLAP system needs to write back the data to the OLTP system
  • C. Batch process are required to keep OLTP and OLAP in sync
  • D. Multiple copies of the data exist
  • E. Only the OLAP system has a predefined subset of the data

Answer: B,C,D,E

 

NEW QUESTION 57
......

True C-TS422-1909 Exam Extraordinary Practice For the Exam: https://www.actual4exams.com/C-TS422-1909-valid-dump.html