NEW QUESTION 40
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
- A. Minimum lot sizing
- B. Fixed lot sizing
- C. Exact lot sizing
- D. Periodic lot sizing
Answer: D
NEW QUESTION 41
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Indicator Relevant for finite scheduling must be set.
- C. PRT Availability check must be set.
- D. Checking rule and group must be assigned.
Answer: A,B
NEW QUESTION 42
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:
- A. Floating time
- B. Processing time
- C. Queue time
- D. Move time
- E. Tear down time
Answer: A,C,D
NEW QUESTION 43
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:
- A. Individual control recipes
- B. Individual phases
- C. Individual operations
- D. Individual process instructions
Answer: B,C
NEW QUESTION 44
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Work center hierarchy
- B. Operation network
- C. Resource network
- D. Setup matrix
Answer: A
NEW QUESTION 45
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work Center BOM
- B. Sales Order BOM
- C. Functional Location BOM
- D. Class BOM
Answer: B,C
NEW QUESTION 46
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of a purchasing contract
- B. Change of the storage bin
- C. Creation of dependent requirements
- D. Creation of a sales order
- E. Change of the material's procurement type
Answer: C,D,E
NEW QUESTION 47
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When a material has a configurable BOM
- C. When multiple material is have similar BOMB
- D. When a material has multiple BOMB
Answer: A
NEW QUESTION 48
What is the purpose of collective orders?
- A. To post production costs on a cost collector instead of the production order
- B. To post any component withdrawals single back flush with order confirmation
- C. To combine order management of co-products and by-products with the main product
- D. To manage production orders for an entire finished product on multiple levels
Answer: D
NEW QUESTION 49
Where do you maintain the duration of a product on operation?
- A. Material master
- B. Routing
- C. Bill of material (BOM)
- D. Work instructions
Answer: B
NEW QUESTION 50
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the total production lead time for along production line
- C. To provide timely updates of inventory management for the staged components
- D. To stage different components for a production line simultaneously
Answer: A,C
NEW QUESTION 51
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:
- A. MRP Live can priorities demand from sales orders
- B. MRP Live can create production orders automatically
- C. MRP Live can plan materials with recursive BOMs
- D. MRP Live can propose alternative solutions
Answer: D
NEW QUESTION 52
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Engineering Change Record
- B. Bill of Material
- C. Routing
- D. Production Version
Answer: B,C,D
NEW QUESTION 53
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:
- A. Infinite resource and infinite strategy
- B. Infinite resource and finite strategy
- C. Finite resource and infinite strategy
- D. Finite resource and finite strategy
Answer: D
NEW QUESTION 54
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
Answer: C
NEW QUESTION 55
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The plant-specific status
- B. The least restrictive status
- C. The cross-plant status
- D. The most restrictive status
Answer: D
NEW QUESTION 56
What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question.
Response:
- A. Only the OLAP system has the latest data
- B. The OLAP system needs to write back the data to the OLTP system
- C. Batch process are required to keep OLTP and OLAP in sync
- D. Multiple copies of the data exist
- E. Only the OLAP system has a predefined subset of the data
Answer: B,C,D,E